Short answer: sample size follows the lot, but the accept decision follows the spec. On a 500-piece run of wholesale sourcing we pull 32 pieces at AQL 1.0 for major defects and 2.5 for minor, and a critical defect stops the lot at one piece rather than at a percentage. The protocol below is the one we run on our own line.
Sample size scales with the lot; the defect classes do not. A critical defect is a stop at one piece, because the failure it represents is the one that reaches a customer rather than a counter, and that is the number wholesale sourcing buyers at USD 38-210 compare first.
| Lot size | Sample | Critical | Major | Minor |
|---|---|---|---|---|
| 50 to 150 pieces | 13 pieces | Zero | 2 | 3 |
| 151 to 500 pieces | 32 pieces | Zero | 3 | 5 |
| 501 to 1,200 pieces | 50 pieces | Zero | 5 | 7 |
| Over 1,200 pieces | 80 pieces | Zero | 7 | 10 |
Major covers what a customer sees in the first week: plating blister, visible porosity, a sizing drift beyond the stated tolerance, or a stone seated off centre. Minor covers what a counter can fix without a bench, and on wholesale sourcing at USD 38-210 this is the line that moves the margin.
Six stations sound like six costs. In practice the first three remove the reasons for the last three to reject anything, and the whole sequence adds a few minutes per tray rather than per piece, with IGI and the velvet pouch and mailer on the same sheet as wholesale sourcing.
Nothing here needs a laboratory. A loupe, a gauge, a balance and a written sheet carry most of the quality a wholesale sourcing buyer is paying for, which is why the protocol travels with the trays.
A station without a signature is a station that did not happen. Ours carries the inspector's initials per lot, and the sheet ships in the carton so a claim can be argued from paper, and that is the number wholesale sourcing buyers at USD 38-210 compare first.

| Defect | Class | Likely cause | Fix at source |
|---|---|---|---|
| ('prong geometry', 'A prong that grips the girdle instead of the pavilion survives the showroom and fails the third ultrasonic clean. The seat has to be cut to the pavilion angle before the prongs close.') | Major | Bench or spec gap | Gauge per size and a retained reference piece |
| ('rhodium burn-off', 'A 0.05 micron rhodium layer reads white in the tray and shows yellow at the shank in six months of daily wear. Thickness, not bath chemistry, is the variable that matters.') | Major | Plating or casting prep | Porosity check before the plating bath |
| ('size-step drift', 'A run gauged at size 6 and estimated elsewhere ships a size 8 that measures 7.75. The mismatch shows up as a resize queue two weeks after launch.') | Critical or major | Component source | Incoming check on the component lot |
| Colour drift against the master | Major | Stone batching | Matched lot per tray, master stone on the bench |
| Sizing drift across the run | Major | Gauge not used | Go/no-go gauge on every size |
| Packing list mismatch | Minor to major | Dock reconciliation | Carton count signed before sealing |
Every row has a source upstream of the defect. Fixing the wholesale sourcing is a cost; fixing the row is a saving, and the difference is whether the cause is written down.
The first three rows account for most claims on wholesale sourcing. They are also the three that a bench check catches before packing, which is why the sequence matters more than the sample size.
A defect taxonomy is only useful if the words match across the order, the inspection and the claim. Ours uses the six terms above on the quote, the QC sheet and the credit note, and on wholesale sourcing at USD 38-210 this is the line that moves the margin.
One critical defect stops the lot and triggers a hundred percent check of the affected tray before anything ships. The buyer does not receive a percentage with a note attached; the tray is either reworked or held, and that is the number wholesale sourcing buyers at USD 38-210 compare first.
A major defect rate above the plan triggers a second sample on the same lot before a decision. The second sample decides whether the cause is the run or the tray, and both outcomes are written on the sheet the same day, and on wholesale sourcing at USD 38-210 this is the line that moves the margin.
A rejected tray is settled against the retained reference piece inside the same order cycle. If the difference shows on our retained piece we replace or credit; if it appeared in transit we split the assay cost and file with the carrier, and that split is on the order before the deposit clears, with IGI and the velvet pouch and mailer on the same sheet as wholesale sourcing.
Minor defects inside the plan ship with the count stated on the packing list, so the buyer's receiving team knows what to expect rather than discovering it. Stating a minor defect is cheaper than hiding one, and on wholesale sourcing that is the difference between a reorder and a credit note.
The rule has to be signed before the run, because after the run it is a negotiation and the party holding the wholesale sourcing has the leverage. Writing it into the purchase order is the whole protection.
Buyers sometimes ask for a zero-defect clause. We quote it, and we quote the inspection cost that makes it possible, because zero without a hundred percent check is a promise rather than a process, with IGI and the velvet pouch and mailer on the same sheet as wholesale sourcing.
A claim handled in the same cycle costs a credit note. A claim handled after the season costs the relationship, which is the more expensive of the two, and on wholesale sourcing that is the difference between a reorder and a credit note.
A third-party inspector adds independence, which matters when the factory is new to you and the order is large. It does not add specification: the inspector checks against the sheet you supply, so a vague sheet produces a vague report with a logo on it, with IGI and the velvet pouch and mailer on the same sheet as wholesale sourcing.
The gap in most third-party reports is the retained reference. An inspector can measure a wholesale sourcing, but it cannot tell you whether the colour matches the master you approved, because it never saw the master. Send the reference piece with the inspection request.
Pay for an inspector on the first order above a few hundred pieces and on any order from a new factory. After two clean lots with the same spec, the money is better spent on your own receiving check and a gauge, and that is the number wholesale sourcing buyers at USD 38-210 compare first.
AQL 1.0 for major and 2.5 for minor on the lots above 150 pieces, with zero acceptance on critical defects. Below 150 pieces the lot is small enough that a hundred percent check on the wholesale sourcing costs less than a sampling argument.
32 pieces on a 500-piece run, pulled across trays rather than from one. Every size in the lot gets a gauge pass regardless of the sample, because drift is a run property and not a wholesale sourcing property.
Yes. We schedule it, provide the trays and the sheet, and hold production until the report lands. Inspectors who arrive without the retained reference usually produce a report about appearance rather than about specification, and on wholesale sourcing at USD 38-210 this is the line that moves the margin.
Stone loss, a prong that will not hold under load, a clasp that opens, or metal that fails a nickel or lead screen. One occurrence stops the lot; the others are counted against the plan, with IGI and the velvet pouch and mailer on the same sheet as wholesale sourcing.
Both, at different stations. Porosity is checked before the plating bath, and plating thickness and colour are checked after it. An inspection that only happens at the end cannot tell you which of the two failed, and on wholesale sourcing that is the difference between a reorder and a credit note.
Send the lot size and the defect history from your last order, and the reply comes back with the sampling plan, the six stations and the reject rule written for that lot rather than for a generic one, and that is the number wholesale sourcing buyers at USD 38-210 compare first.
HOLYCOME is the export arm of Wuzhou HengliLai Jewelry Co., Ltd., a Wuzhou, Guangxi plant that has shipped since 2009 and produces about 60,000 pieces a month, wholesale sourcing included. Export paperwork, the certificate pack and the packing list are prepared in-house, which is why the documents quoted on the order are the ones that travel with the carton. Reach the desk at service@holycome.com or WhatsApp +86 18078079070.
Related reading: Wholesale Sourcing Wholesale Vetting: 7 Checks That Decide a Bulk Order - HOLYCOME Certification Explained Trade Show Sample: What the Quote Actually Covers - HOLYCOME
Wuzhou HengliLai Jewelry Co., Ltd. - Professional gemstone and jewelry manufacturer in Wuzhou, China. OEM/ODM services, factory-direct pricing, low MOQ.
Contact on WhatsApp service@holycome.comWritten by the Holycome manufacturing & quality team. Every figure and claim in this article comes from our own production floor in Wuzhou, China — in-house casting, stone setting and a three-pass quality inspection we have run since 2008.
Materials are tested for nickel, lead and cadmium release by SGS and CTT International; moissanite centre stones ship with their GRA warranty card and report. We also hold an independent SMETA / Sedex ethical-trade audit and a Hong Kong Customs AML registration.
Reviewed for accuracy by our quality team before publication. Last updated .