Demand for Comparisons is not flat. Five peaks carry most of the year, and each peak rewards a different stocking decision.
Valentine's concentrates in the two weeks before 14 February; Mother's Day in the two weeks before the May Sunday. On Comparisons, both reward a narrow range stocked deep rather than a wide range stocked thin.
Stack the top five designs in the core sizes and let the tail run on repeat orders.
Build the landing date from ship date plus transit plus clearance. Planning from the ship date alone makes every season a week late.
May to September carries bridal and gift. The bridal buyer orders earlier and customises more, so the stock decision is about components, not finished pieces.
On Comparisons, hold setting components and semi-mounts so a custom order can ship in weeks, not months.
| Peak | Window | Stock decision |
|---|---|---|
| Valentine's | Late Jan to 14 Feb | Top five, deep, core sizes |
| Mother's Day | Late Apr to May | Gift sets, packaging ready |
| Graduation | May to June | Entry tier, small sizes |
| Wedding | May to Sept | Semi-mounts and components |
| Q4 | Oct to Dec | Breadth, gift packaging |
Read the table as a checklist rather than a recommendation. The right row depends on the price band, the wear pattern and the channel you sell into.
Ask for the mill certificate and the stone invoice. Two documents turn a material claim into something an auditor can check.
Q4 rewards breadth and gift packaging; January rewards the entry tier and the reset. The two need different stock, and the transition happens in ten days.
Plan the January markdown before Q4, not after. The designs that will not repeat should be bought shallow.
Buy deep on the top five, shallow on the tail, and keep one size curve rather than a full run. Review sell-through weekly during a peak, not monthly.
On Comparisons, the weekly review is what turns a peak from a guess into a reorder schedule.
Price moves with three inputs: alloy, stone and plating. A quote that holds for ninety days is a quote that has priced those three honestly.
Run the five checks below in order. The first two protect the money, the last three protect the launch date.
If a supplier cannot answer three of the five, treat the quote as a starting point rather than a plan. Ask again in writing and keep the answer with the PO.
Valentine's, Mother's Day, graduation, wedding season and Q4. Each rewards a different stock shape.
No. One core curve covers most demand; the extremes can run on repeat orders.
Weekly. Monthly is too slow to trigger a reorder before the window closes.
Semi-mounts and setting components, so a custom order ships in weeks.
A January reset to the entry tier. Plan the markdown before the peak, not after.
Stock for the top three designs, made to order for the tail. Stock cover is a calculation from sell-through and lead time.
Send the Comparisons category plan. We return a five-peak stocking calendar with the depth and size curve for each. See the full range at Comparisons and HOLYCOME.
None of this is exotic. It is a document, a measurement and a date, repeated until it becomes a process.
Wuzhou HengliLai Jewelry Co., Ltd. - Professional gemstone and jewelry manufacturer in Wuzhou, China. OEM/ODM services, factory-direct pricing, low MOQ.
Contact on WhatsApp service@holycome.comWritten by the Holycome manufacturing & quality team. Every figure and claim in this article comes from our own production floor in Wuzhou, China — in-house casting, stone setting and a three-pass quality inspection we have run since 2008.
Materials are tested for nickel, lead and cadmium release by SGS and CTT International; moissanite centre stones ship with their GRA warranty card and report. We also hold an independent SMETA / Sedex ethical-trade audit and a Hong Kong Customs AML registration.
Reviewed for accuracy by our quality team before publication. Last updated .