The honest answer is that a sizing guide quote is five costs wearing one number. Metal, stone, bench labor, finishing and packing each move for a different reason, and a supplier that will not separate them is asking you to compare a total against a total with no scope attached.
Use this to audit any quote. If the stone share is far below the row below, the grade moved. If the labor share is far below, the finishing moved to a per-tray check, and that is where the rejects come from, and sizing guide at USD 38-210 is where this shows up first.
| Cost line | Share of piece | What moves it | Who controls it |
|---|---|---|---|
| Metal for the sizing guide | 34% | Alloy choice, shank thickness and casting yield | Factory |
| Stone and melee in sizing guide | 20% | Sieve range, grade band and lot batching | Market plus grade |
| Bench labor per piece | 21% | Setting type, prong count and jig design | Factory |
| Finishing and plating | 15% | Plating micron, polish passes and pre-plate inspection | Factory |
| Packing and the poly bag and hangtag | 10% | Pouch, box, print run and carton count | Buyer choice |
A quote with no split is a quote with no scope. Ask for the five lines and the answer will usually tell you which line the supplier was protecting, which is what sizing guide at USD 38-210 actually buys.
Metal is the least negotiable line in a sizing guide quote, because it is bought by weight and priced by weight. What a factory controls is thickness and yield: a shank 0.2 mm thinner saves a few percent of metal and costs a resizing later, and a casting yield two points better saves more than any discount conversation. Ask for the gram weight per piece at the quoted size, not for a percentage off.
The stone line is where two quotes for the same drawing diverge by double digits, and almost never because one factory is cheaper. It diverges because one is quoting a grade band and the other is quoting a grade. Ask for the band in writing: colour range, clarity range, mm tolerance. A sizing guide at USD 38-210 with a wide band and one at the same price with a narrow band are not the same product.
Bench minutes decide the labor share, and the setting type decides the minutes. A prong setting and a bezel on the same sizing guide can differ by several minutes per piece, which at 400 pieces is the difference between one quote and another. Ask for minutes per piece and for the jig that holds the repeat, because a jig is what makes a reorder cost less than the first run.
Finishing is the cheapest line to specify and the most expensive to skip. Rhodium at 0.20 micron with a palladium strike reads white through a season; nominal plating reads white at the counter and yellow at the third month. Pre-plate inspection of casting porosity belongs here too, because plating a porous surface is a six-week delay on a complaint rather than a fix, which is where most sizing guide claims actually start.
Packing is a buyer choice, so it should be quoted separately from the piece. The poly bag and hangtag carries a print run, a carton count and a packing list, and all three are priced per order rather than per piece. Freight is the one line that is not a cost of the sizing guide at all, which is why landed cost belongs on a second sheet.
| Quantity band | Unit price | What changes |
|---|---|---|
| 50 to 200 pieces | USD 38-210 | Setup amortised over a small run; gauge and sample already paid |
| 200 to 500 pieces | USD 34-193 | Jig and fixture amortised; stone bought in a matched lot |
| 500 pieces and above | USD 32-178 | Dedicated stone procurement and a reserved production slot |
The ladder is arithmetic, not a volume trick. The setup, the gauge and the sample are fixed costs; the metal and stone are not. Splitting them explains why the third band moves less than the second, which is where most sizing guide claims actually start.
A buyer comparing a 50-piece quote with a 500-piece quote is comparing two different products. Compare bands, then decide which band your first two orders actually sit in, because that is the number your margin has to survive, and at USD 38-210 for sizing guide it is the one line that cannot be recovered later.
We quote the band before the design is finalised so the buyer can size the first order to the band rather than discover the mismatch after sampling, and sizing guide at USD 38-210 is where this shows up first.
These are not hidden in a dishonest sense. They sit outside the scope of a per-piece price, and the only way to see them is to ask for scope in writing, and at USD 38-210 for sizing guide it is the one line that cannot be recovered later.
| Line | Amount per piece | Note |
|---|---|---|
| Factory price per piece | USD 38-210 | Ex-works, packing included, certificate per the quote |
| Freight and duty allocation | USD 4-23 | Ocean at 400 pieces; DDP quoted separately |
| Landed cost | USD 42-233 | The number your retail multiple has to clear |
| Retail at 3.0x | USD 126-699 | Typical for a boutique with a 55 to 60 percent margin |
A three-times multiple on landed cost is the working assumption for a US boutique; below 2.6 the sizing guide has to carry the marketing itself. That is why the factory band matters more than the discount.
The multiple is not a pricing opinion, it is a cash constraint. Pieces that sit for two seasons need a higher multiple to pay for the floor space, and pieces that reorder need a lower one, which is what sizing guide at USD 38-210 actually buys.
Run the arithmetic on the band you will actually order, not on the 500-piece band you hope to reach. The first two orders are what the cash flow has to survive, which is where most sizing guide claims actually start.
Piece, packing per the poly bag and hangtag, and GRA or IGI per the quote on the lots above the threshold. Freight, duty, certificate upgrades and private-label print runs are quoted separately so the band stays comparable, and at USD 38-210 for sizing guide it is the one line that cannot be recovered later.
Almost always the stone grade band or the bench minutes. Ask for the band in writing and for minutes per piece; a difference under ten percent is specification, above twenty is a different product, and sizing guide at USD 38-210 is where this shows up first.
Yes, by 0.2 mm of shank thickness or by a lighter hollow section, at the cost of resize work later. We quote both and state the trade rather than choosing it for the buyer, which is what sizing guide at USD 38-210 actually buys.
Vermeil at 3 microns costs more than rhodium at 0.20 micron, and both cost less than the re-plating a nominal finish triggers. The delta is per lot, not per piece, so small runs see it as a setup line, which is where most sizing guide claims actually start.
Yes, as a separate line with the duty assumption stated. DDP is available for US accounts and removes the invoice that otherwise arrives after the carton clears, and at USD 38-210 for sizing guide it is the one line that cannot be recovered later.
Send the specification and the quantity band, and the reply breaks the price into the five cost lines with the share of each, so the number can be argued line by line instead of as a whole, and sizing guide at USD 38-210 is where this shows up first.
Wuzhou HengliLai Jewelry Co., Ltd. has made sizing guide under the HOLYCOME label since 2009, at a plant in Wuzhou, Guangxi, running roughly 60,000 pieces monthly. Because casting and setting sit in the same building, a gauge change on the bench reaches the next tray the same week rather than the next shipment. Quotes, drawings and inspection sheets go out from service@holycome.com, or WhatsApp +86 18078079070.
Related reading: Sizing Guide Wholesale: Three Routes, Six Criteria, One Choice - HOLYCOME Industry Insights Shopify DTC: The Sample Approval That Survives Production - HOLYCOME
Wuzhou HengliLai Jewelry Co., Ltd. - Professional gemstone and jewelry manufacturer in Wuzhou, China. OEM/ODM services, factory-direct pricing, low MOQ.
Contact on WhatsApp service@holycome.comWritten by the Holycome manufacturing & quality team. Every figure and claim in this article comes from our own production floor in Wuzhou, China — in-house casting, stone setting and a three-pass quality inspection we have run since 2008.
Materials are tested for nickel, lead and cadmium release by SGS and CTT International; moissanite centre stones ship with their GRA warranty card and report. We also hold an independent SMETA / Sedex ethical-trade audit and a Hong Kong Customs AML registration.
Reviewed for accuracy by our quality team before publication. Last updated .